Green Acres Quality Way Pump Station Upgrades
BID DATE
08/27/26 - 3:00
AGENCY
Ware Shoals SC
ESTIMATE
n/a
SCOPE
The project consists of the replacement / upgrade of two existing wastewater pumping stations as follows: Green Acres Pump Station: Removal and replacement of the existing concrete wetwell, valve vault, tops /hatches, piping, valves, permanent standby power generator, concrete pads, fencing, pumps, control panel, and electrical. Also included is the installation of a new dual auger screen system, one (1) 5’ diameter doghouse manhole, 10 LF of 15” gravity sewer, grading, site work, bypass pumping, and all associated work tasks required for a complete installation.