Cardross Lane Outfall Stabilization Rebid
BID DATE
07/29/26 - 5:00
AGENCY
Columbia SC
ESTIMATE
n/a
SCOPE
This project consists of stabilizing the eroded stream banks along #1 and #3 Cardross Lane with the installation of gabion baskets. The project also includes removal of accumulated debris from within the channel to restore the channels conveyance capacity. The Project limits are between #1 Cardross Lane and #3 Cardross Lane, with access to the project from King Charles Road. The project includes repairing undermined areas stream bank with gabion baskets, slope grading and stabilization and landscaping. https://columbiasc.ionwave.net/PublicDetail.aspx?bidID=1942&SourceType=1 Whitney.Oswalt@columbiasc.gov