Access the Full Project by Clicking here!
Bidjugde
JOB
Summit View Water System Pipe Replacement
BID DATE
07/30/26 - 10:00
AGENCY
Glenwood Springs
ESTIMATE
n/a
SCOPE
The work includes removing and replacing approximately 1770 feet of waterline, from the sheep trough T to the iodinator. Replacement includes 2” minimum diameter HDPE waterline, pipe zone bedding, utility locating system, an air release valve, drains, and backflow preventer, along with incidentals like heat fusion joints and trenching. https://sam.gov/workspace/contract/opp/3720df6aa9574009b3dd6f671f4afc19/view lonnie.root@usda.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT