Access the Full Project by Clicking here!
Bidjugde
JOB
ALCO Pub Wks F272 Line A 1 Capacity Improvements Claremont Ave Mystic St Tanglewood Rd
BID DATE
08/11/26 - 7:00
AGENCY
Alameda County
ESTIMATE
n/a
SCOPE
The project, in general, consists of preparing and implementing water pollution control plan; job site management; designing, installing, maintaining and removing traffic control systems; providing trench and excavation protection; performing structure excavation and off hauling resulting materials; installing approximately 4,080 linear feet of reinforce concrete pipe; constructing associated reinforced concrete manhole structures; furnishing and installing controlled low strength material backfill; restoring roadway structural section, traffic stripping and pavement markings; reconstructing curb, gutter, and sidewalk; cleaning site and miscellaneous work; furnishing of all labor, materials, tools, equipment, workmanship, transportation and services and miscellaneous work necessary to be done in order to complete said project. https://www.ipdservices.com/clients/eastbay/?ALCO jami@acpwa.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT