Access the Full Project by Clicking here!
Bidjugde
JOB
Avenue 50 Bridge Over Coachella Valley Stormwater Channel Improvement
BID DATE
08/19/26 - 7:00
AGENCY
Coachella
ESTIMATE
n/a
SCOPE
The scope of work includes construction of a new five?span bridge over the CVSC (Whitewater River); the removal and reconstruction of Concrete Slope Protection (CSP) to preserve channel stability and maintain required hydraulic performance; removal and reconstruction of the CV/Link multimodal pathway; installation of new waterlines; reconstruction of concrete curb, curb and gutter, and driveways; placement of hot mix asphalt pavement; and installation of all required traffic signs, pavement markings, and striping in accordance with current CA MUTCD standards. bgreenwood@coachella.org
PREBID
7/28/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT