Access the Full Project by Clicking here!
Bidjugde
JOB
Drainage Modifications Johnson St
BID DATE
07/23/26 - 7:00
AGENCY
Pembroke Pines
ESTIMATE
n/a
SCOPE
The project consists of the installation of two 15-inch ADS Nyloplast drain basins along Johnson Street, connected by approximately 198 linear feet of 12-inch HDPE storm drainage pipe. An additional approximately 120 linear feet of 12-inch HDPE pipe will connect the second drain basin to an existing catch basin. https://procurement.opengov.com/portal/pembrokepines/projects/275731 purchasing@ppines.com.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT