Access the Full Project by Clicking here!
Bidjugde
JOB
Little Creek Resource Recovery Facility Rehabilitation Replacement Contract 2
BID DATE
08/4/26 - 7:00
AGENCY
Raleigh
ESTIMATE
n/a
SCOPE
Replacement of disc aerators and drive, valves, gates, denitrification pump and guiderails, in oxidation ditch. Replacement of aerator for jet mixing system in waste sludge day tank and replacement in-kind of existing sludge pump. Installation of new sludge piping to connect waste sludge day tank to truck loadout. Replacement of chem feed and storage including both bulk storage tanks and piping, recirculation pump, chemical metering pumps, new eyewash station and associated tepid water piping with instantaneous water heater. Installation of jet aeration system, associated piping and pumps, blowers, in Equalization Tank No. 1. Installation of mixed liquor and RAS piping to connect Equalization Tank No. 1 to the clarifier distribution box. Installation of drain lines from both secondary clarifiers to drain line to headworks. Installation of precast meter vault on WAS line, installation of new electrically actuated valves on WAS line. Demolition of electrical equipment in operations building electrical room and installation of pre-cast concrete electrical building, new transformer. Associated ductbank for new equipment. Associated instrumentation for new equipment. https://evp.nc.gov/solicitations/details/?id=da42df47-b968-f111-a824-001dd803db57 EslamiM@bv.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT