Access the Full Project by Clicking here!
Bidjugde
JOB
Third Street Grade Separation BNSF Railroad
BID DATE
08/19/26 - 7:00
AGENCY
Riverside
ESTIMATE
$43,426,081
SCOPE
Construction of a quadruple track concrete bridge structure. Excavation and grading of Third Street for approximately 1,340 feet, from approximately 400 feet west of the BNSF crossing to approximately 940 feet east of the BNSF crossing. Construction of a new roadway pavement along Third Street, including concrete curbs, gutters, sidewalks, wheelchair ramps, driveways and retaining walls. Reconfiguration of local streets. Relocation, reconstruction and realignment of wet and dry utilities, including, but not limited to, the Riverside Canal. https://vendors.planetbids.com/portal/39475/bo/bo-detail/143965
PREBID
7/29/2026 2:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT