Access the Full Project by Clicking here!
Bidjugde
JOB
Madera Canyon Medium Wash Florida Wash Bridge Replacements
BID DATE
08/4/26 - 10:00
AGENCY
Pima County
ESTIMATE
n/a
SCOPE
The proposed scope of work for the Florida Canyon Wash Project (24041PJ) includes the construction of a detour to carry Madera Canyon Road traffic around the Florida Canyon Wash construction site as well as the Medium Wash construction site, removal of an existing concrete slab bridge at Florida Canyon Wash, construction of a new 3-span cast-in-place concrete closed frame bridge (Superbox) at Florida Canyon Wash, concrete retaining wall, riprap slope protection, asphalt concrete surface roadway, guardrail, and other incidental items. The proposed scope of work for the Medium Wash Project (24043PJ) includes removal of an existing concrete slab bridge at Medium Wash, construction of a new 3-span cast-in-place concrete closed frame bridge (Superbox) at Medium Wash, riprap slope protection, replacement of an existing single-barrel 36-inch corrugated metal pipe (CMP) culvert with a single-barrel 36- inch reinforced concrete pipe (RCP) culvert, asphalt concrete surface roadway, guardrail, and other incidental items. Judy Cooper 520-724-3727 judy.cooper@pima.gov https://www.bidnetdirect.com/arizona/solicitations/open-bids/Madera-Canyon-Medium-Wash-and-Florida-Wash-Bridge-Replacements/0000429823?purchasingGroupId=700132901&origin=2
PREBID
7/23/2026 6:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT