Access the Full Project by Clicking here!
Bidjugde
JOB
Pleasant Beach Drive Extension
BID DATE
07/29/26 - 3:00
AGENCY
Bainbridge Island
ESTIMATE
n/a
SCOPE
Will pave the existing 580 linear foot gravel portion of roadway with Asphalt. The single lane width and slope of the roadway will effectively remain. One pullout meeting City standards will be constructed along the route. Stormwater runoff from the newly paved road will be collected and receive Basic treatment per the Washington State Ecology 2024 Stormwater Management Manual for Western Washington. Basic treatment will be accomplished by collecting surface runoff and conveying it to one of two Contech StormFilter units located along the roadway. Once treated, stormwater will be conveyed to existing roadside ditches that will be restored during construction to ensure adequate size and composition. Existing surface flow in the area will continue to be directed to the restored roadside ditches. https://www.bainbridgewa.gov/bids.aspx?bidID=187 cityclerk@bainbridgewa.gov.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT