Access the Full Project by Clicking here!
Bidjugde
JOB
Surface Water Treatment Plant Rehab Phase 1
BID DATE
08/6/26 - 7:00
AGENCY
Sugar Land
ESTIMATE
n/a
SCOPE
Work for this contract is for the modification and rehabilitation of the existing Surface Water Treatment Plant. The project includes all work as shown and specified on the Drawings and as shown in the Technical Specifications. In summary, the work includes: Mobilization, bonds, and insurance by the Contractor to initiate project start-up, as specified in Contract Documents. Demolish and remove existing chemical feed pumps, piping, fittings, calibration column and associated electrical and control components associated with the following chemical feed applications. Install new 12.5% sodium hypochlorite dosing pumps skids for granular activated carbon (GAC) backwash including pumps, piping, fittings, calibration column, flow meter and integral variable frequency drive (VFD) and controls. Install new 12.5% sodium hypochlorite dosing pumps skids for Post-Chemical mixing including pumps, piping, fittings, calibration column, flow meter and integral VFD and controls. https://procurement.opengov.com/portal/sugarlandtx/projects/277498
PREBID
7/14/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT