Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2026 27 Annual Major Streets Rehabilitation Program Los Angeles Avenue First Street Erringer Roa
BID DATE
07/21/26 - 8:00
AGENCY
Simi Valley
ESTIMATE
n/a
SCOPE
Construction surveying; 2) 30 L.F. of root pruning; 3) 30 L.F. of root barrier; 4) 9 tree removals; 5) 398,051 S.F. of 2 1/2" asphalt pavement cold milling; 6) 2,980 S.F. of sidewalk reconstruction; 7) 1,308 S.F. of sidewalk removal; 8) 210 L.F. of concrete sidewalk grinding; 9) 34 L.F. of curb reconstruction; 10) 191 S.F. of cross gutter and spandrel reconstruction; 11) 3,941 S.F. of commercial driveway approach reconstruction; 12) 18 curb ramp reconstruction; 13) 6 truncated domes detectable warning surface installation; 14) 1,343 S.F. of bus turnout reconstruction; 15) 1 post installation and pedestrian push button assembly relocation; 16) 3 pedestrian push button assembly relocation. https://www.simivalley.org/Home/Components/RFP/RFP/386/169 akhandaker@simivalley.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT