Access the Full Project by Clicking here!
Bidjugde
JOB
Alyce Gereaux Park Renovation
BID DATE
03/16/16 - 2:00
AGENCY
Brawley
ESTIMATE
n/a
SCOPE
The work to be done generally consists of furnishing all labor, materials, necessary tools, equipment, supervision, appurtenances, and all utility coordination with the utility owners for; Renovation of an existing park including: Clearing and grubbing of the existing site within the limits shown on the Plans, removal of existing site furnishings, saw cutting and removal of asphalt and concrete pavement, resurfacing of an existing basketball court, connections to the existing irrigation system, lime stabilization of expansive soils, other miscellaneous improvements on or adjacent to the site; construction of concrete curbs, gutters, sidewalk, pedestrian walking paths, drainage facilities, landscaping and irrigation, domestic water and sewer services, lighting, prefabricated restroom building, splash pad, amenities including shade structures, benches, ADA playground equipment, shade sail structures, bike rack, trash receptacles, and other miscellaneous site improvements.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT