2026 Sewer Improvements
BID DATE
07/22/26 - 3:00
AGENCY
Mukilteo
ESTIMATE
$950,000
SCOPE
The project consists of the installation of approximately 560 linear feet of 10-inch DR11 HDPE gravity sewer main using the Horizontal Directional Drilling and open trench methods. The project includes the installation of approximately 70 linear feet of 8-inch PVC Sewer Main, three 48-inch manholes, one 54-inch saddle manhole, and two side sewers with associated cleanouts. The project also provides for the demolition of an existing lift station, including pumping equipment, standby generator and generator enclosure, piping, valves, and other mechanical equipment. The project also includes hot mix asphalt trench patch, installation of two ADA curb ramps, driveway restoration, and general restoration. The project also provides for roadway improvements consisting of a 2-inch grind and hot mix asphalt overlay with pavement markings. http://bxwa.com/bxwa_toc/pub/4349/mwd8_mukilteo_water_and_wastew_26698/info.php

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT