Water Conservation Program Implementation Package No. 1
BID DATE
01/29/16 - 3:00
AGENCY
Lake Havasu
ESTIMATE
n/a
SCOPE
This project consists of converting the irrigation water source at London Bridge Beach Park and Rotary Community Park from potable water to reclaimed water. This will involve disconnecting both parks irrigation systems from potable water lines, reconnecting them to reclaimed water lines, the installation of approximately 842 linear feet of fusible 6-inch PVC, 25 linear feet of 8-inch PVC, 6 linear feet of 2-inch PVC, fittings, valves, wet tapping valves, metering assembly and vault, access vault, 2-inch combination air release valves and manhole, appurtenances, and surface replacement for areas disturbed by the work.