Access the Full Project by Clicking here!
Bidjugde
JOB
East Los Angeles Whiteside Street Ph I
BID DATE
07/14/26 - 7:00
AGENCY
Los Angeles County
ESTIMATE
$9,000,000
SCOPE
Reconstruct 2.3 mi of local streets and construct a drain to convey stormwater. The reconstruction includes pulverization and stabilization of the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB). Paving includes rubberized hot-mix asphalt over conventional asphalt concrete. The storm drain on Buelah Circle will be constructed to capture stormwater and convey it to existing catch-basins on Dodds Street. https://dpw.lacounty.gov/contracts/cons/ProjectDetailAdv.aspx?project_id=RDC0015913 IVasquez@dpw.lacounty.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT