Access the Full Project by Clicking here!
Bidjugde
JOB
CIP 320 O Hara Avenue Widening 600 South Laurel Road 300 South Grapevine Lane
BID DATE
07/16/26 - 7:00
AGENCY
Oakley
ESTIMATE
$1,703,295
SCOPE
Project includes but is not limited to: Mobilization and demobilization; traffic control and construction signage; removal and replacement of traffic striping, marking, and markers; clearing and grubbing, tree removal and relocation, roadway excavation including removal of pavement and base material, removal of subbases, native material fill, construction of new concrete curb and gutter, sidewalk; rubberized hot mix asphalt (RHMA), hot-mix asphalt (HMA) pavement and base; driveways; drainage modifications, utility adjustments, water and sewer connections; signing and striping and other work. https://www.oakleyca.gov/bids.aspx?bidID=23 hhabib@ci.oakley.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT