Access the Full Project by Clicking here!
Bidjugde
JOB
CIP 333B FY 2025 26 Street Repair Resurfacing
BID DATE
07/9/26 - 7:00
AGENCY
Oakley
ESTIMATE
n/a
SCOPE
Project includes but is not limited to: mobilization, clearing and grubbing, traffic control and construction areas signs, water pollution control program, surveying and construction layout, cold planning existing AC, removal of surfacing and base, subgrade preparation, Hot Mix Asphalt (HMA) paving, HMA base repairs, off hauling and disposing of grindings to a location within the City of Oakley, crack seal, rubber chip seal, micro-surfacing, slurry seal, lowering and adjusting to finish grade utility facilities, traffic loop detectors, traffic striping, clean-up, and various other work as shown in the Contract Plans, as specified in the Contract Documents, and as directed by the City Engineer. https://www.oakleyca.gov/bids.aspx?bidID=22 hhabib@ci.oakley.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT