Access the Full Project by Clicking here!
Bidjugde
JOB
2015 16 Sewer Capacity Upgrades
BID DATE
02/17/16 - 2:00
AGENCY
Pasadena
ESTIMATE
n/a
SCOPE
THIS PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 2,900 FEET OF SEWER AT VARIOUS LOCATIONS WITHIN THE CITY. THEY ARE FOREST AVENUE FROM HAMMOND STREET TO EVERTS STREETS, SUNSET AVENUE FROM 79 FEET SOUTH OF GLORIETA STREET TO POPLAR LANE, MICHILLINDA AVENUE FROM FOOTHILL BOULEVARD TO MAYFAIR DRIVE, FAIR OAKS AVENUE FROM ARLINGTON DRIVE TO 33 FEET SOUTH OF STATE STREET, COLUMBIA PLACE FROM FAIR OAKS AVENUE TO 404 FEET SOUTH OF FAIR OAKS AVENUE, AND SAN RAFAEL AVENUE FROM SAN RAFAEL TERRACE TO 107 FEET EAST OF SAN RAFAEL TERRACE. THE WORK CONSISTS OF REMOVING 8 TO 10-INCH DIAMETER VITRIFIED CLAY PIPE AND REPLACING THEM WITH 10 TO 18-INCH DIA¬METER VITRIFIED CLAY PIPE; SEWER BYPASS; RECONSTRUCTING EXISTING SEWER MANHOLE FLOORS AND/OR WALLS; REMODELING HOUSE CONNECTION SEWERS; REMOVAL OF ANY UNDERGROUND CONCRETE ENCASEMENT ENCOUNTERED; REMOVING AND RESTORING PCC OR ASPHALT CONCRETE PAVEMENT; REMOVING AND RECONSTRUCTING SIDEWALKS, CURB RAMPS, AND CURB AND GUTTER; REMOVING AND RESTORING LANDSCAPING; REMOVING AND RELOCATING EXISTING STREETLIGHT; INSTALLING 6-FT DIAMETER CIRCULAR LOOP DETECTORS AS NEEDED; REFURBISHING TRAFFIC STRIPING AND/OR MARKINGS; TRAFFIC CONTROL AND DETOUR AS NECESSARY; POST-CONSTRUCTION CCTV INSPECTION; AND MISCELLANEOUS APPURTENANT WORK. Roubik Mardirosian 626-744-7456 rmardirosian@cityofpasadena.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT