Generation Park East Outfall
BID DATE
07/28/26 - 7:00
AGENCY
Generation Park Management District
ESTIMATE
$30,000,000
SCOPE
The Project consists of approximately 218,000 C.Y. of excavation and fill placement for drainage channels, 25,000 SY of 6-inch and 8-inch reinforced concrete channel lining, 4,500 L.F. of 24-inch to 8’ x 6’ storm sewer 2,300 S.Y. of asphalt paving, a 191 L.F. Aqueduct Road bridge over the proposed District drainage channel, and installation of a 4-60” barrel siphon including reinforced concrete inlet and outlet structures on the Coastal Water Authority (CWA) West Canal under the proposed District drainage channel. https://www.civcastusa.com/project/6a3af53209e6804996bd5ae8/summary kconerly@idseg.com
PREBID
7/7/2026 3:00