Access the Full Project by Clicking here!
Bidjugde
JOB
Water Main Rehab Package 6 North
BID DATE
08/5/26 - 7:00
AGENCY
Seattle
ESTIMATE
$5,823,000
SCOPE
This Project consists of the following elements of Work: Abandon in-place existing watermains; install new ductile iron watermain pipe, including valving, fire hydrants, and other watermain appurtenances, ranging from 4 inch to 12 inch in diameter by open-trench method; install new 2 inch diameter copper water main pipe via trenchless moling; storm drainage improvements; assist SPU Water Operations with: cut, cap, blocking of existing watermains, temporary and permanent water main connections, and temporary and permanent water services connection transfers; installation of a pressure regulating station including discharge piping to a new air gap vault, and SCADA monitoring system at the NW 201st St site; and final surface restoration of roadway and landscaping, including ADA curb ramp improvements. https://procurement.opengov.com/portal/seattle/projects/279375 kai.fan@seattle.gov gina.owens@seattle.gov
UPDATES