Access the Full Project by Clicking here!
Bidjugde
JOB
Halsell 11th Street Drainage Improvements
BID DATE
07/10/26 - 2:00
AGENCY
Bridgeport
ESTIMATE
n/a
SCOPE
The project consists of furnishing all labor, equipment, and materials (except as otherwise specified), and performing all work necessary for the Halsell & 11th St. drainage improvements. This includes the installation of the following, 415 LF of 24” HDPE Storm Pipe, 116 LF of 18” HDPE Storm Pipe, Storm Junction Box with Manhole Riser, Catch Basins with Pedestrian-Safe Grate Inlets, 10’ Curb Inlet. This includes reconstruction of asphalt and concrete pavement repair, driveway, and concrete curb and gutter reconstruction. holmos@cityofbridgeport.net https://www.civcastusa.com/project/6a39601454611b5d577bd69b/summary bsherrieb@dunaway.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT