Pedestrian Bridge
BID DATE
07/13/26 - 7:00
AGENCY
Sheridan
ESTIMATE
n/a
SCOPE
Work includes erosion controls, site security, and ultra-block abutment construction. The Owner-supplied 66,000 lb., 80-foot railcar bridge will be unloaded, set onto abutments, and anchored per Project Drawings. ADA-compliant concrete ramps will be constructed on both sides for accessible entry. Removable bollards will be installed. Project concludes with site cleanup and vegetation restoration. All work per Project Specifications and Drawings. https://oregonbuys.gov/bso/external/bidDetail.sda?docId=S-KS0055-00017318&external=true&parentUrl=close kiec@sheridanPW.com