Access the Full Project by Clicking here!
Bidjugde
JOB
California Baker Street Reconstruction PW 26 04
BID DATE
07/21/26 - 7:00
AGENCY
Coalinga
ESTIMATE
n/a
SCOPE
The project consists of the reconstruction of California Street, including both northbound and southbound lanes from West Washington Avenue to Cambridge Avenue, and the reconstruction of Baker Street including the eastbound lane from California Street to Sunset Avenue. The project includes full depth roadway reconstruction, concrete improvements, and traffic safety enhancements. The reconstruction of California street includes three (3) pavement structure design sections based on site conditions. Case A consists of three inches (3") of asphalt concrete (AC), seven and one-half inches (7.5") of aggregate base (AB), and twelve inches (12") of compacted subgrade. Case B consists of three inches (3") of asphalt concrete (AC), eleven and one-half inches (11.5") of aggregate base (AB), and twelve inches (12") of compacted subgrade. Case C consists of a pavement section matching the existing section on baker street, which includes three inches (3") of asphalt concrete (AC), eight inches (8") of aggregate base (AB), and twelve inches (12") of compacted subgrade. https://www.coalinga.com/bids.aspx?bidID=113 info@tricityengineering.com
PREBID
7/7/2026 4:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT