Access the Full Project by Clicking here!
Bidjugde
JOB
Astor Palmetto Drainage System Improvements
BID DATE
07/30/26 - 7:00
AGENCY
New Port Richey
ESTIMATE
n/a
SCOPE
The Work is generally described as furnishing all labor, materials, equipment, tools, transportation, services and incidentals necessary to provide the Owner with the following project elements: • Approximately 927 linear feet of 12”x 18” ERCP, 285 linear feet of 14” x 23” ERCP, 691 linear feet of 19” x 30” ERCP • Seven Type P-7 manholes and 15 Type C inlets and 4 Type D inlets. • One Baffle Box • Approximately 400 Linear Feet of 8-inch PVC Water Main. • Approximately 1000 Linear Feet of 6-inch PVC Water Main. • Miscellaneous piping, valves, associated piping appurtenances, connections to existing water systems, various service assemblies, etc. • Restoration of asphalt pavement, curbing, sidewalks, driveways, pavement marking, etc. https://www.demandstar.com/app/limited/bids/539778/details rjohnson@ectinc.com.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT