Access the Full Project by Clicking here!
Bidjugde
JOB
GDOT PI 0021607 N Cherokee Road Rose Lane Partee Drive
BID DATE
07/23/26 - 1:00
AGENCY
Social Circle
ESTIMATE
n/a
SCOPE
The proposed Transportation Alternatives Program (TAP) project consists of the construction of new curb, gutter, and sidewalk facilities along the west side of North Cherokee Road from Rose Lane to Partee Drive. The project is intended to improve pedestrian safety, accessibility, and connectivity within the corridor by providing a continuous ADA-compliant pedestrian route where existing infrastructure is limited or absent. The scope of work includes the installation of concrete curb and gutter, construction of a new sidewalk, grading and drainage improvements as necessary, utility adjustments and relocations, driveway tie-ins, erosion and sedimentation control measures, pavement restoration, and all associated traffic control and signage required during construction. The project will also include ADA-compliant curb ramps and pedestrian accessibility features at roadway intersections and crossing points. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66276-NONST-2026-000000026&sourceSystemType=gpr20 rgroves@socialcirclega.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT