JOB
Cdbg MIT Hickory Creek Garden Acres Herridge Miller Brookland Acres Subdivision Drainage Improvemen
BID DATE
07/16/26 - 7:00
AGENCY
Pearland
ESTIMATE
n/a
SCOPE
Drainage improvements for the Hickory Creek, Garden Acres, Herridge Miller/Brookland Acres Subdivision, and Hickory Slough Embankment Slope Replacement. The project includes a total of approximarely 8.9 miles of roadside ditch regrading, an estimate 2.5 miles of storm sewer culvert replacement, including circular reinforced concrete pipe ranging from 18 inches to 30 inches in diameter, arch reinforced concrete pipe ranging from 22 inches by 13 inches to 36 inches by 23 inches, approximately 3.1 miles of asphalt pavement rehabilitation, and replacement of sidewalk and driveways. For Hickory Slough Embankment Slope Replacement, the existing failed concrete slope paving will be replaced with 8 inch concrete slope paving to stabilize the embankment. Additionally, the project requirements include traffic control, miscellaneous signage, SWPPP measures, and other items, to facilitate construction of this project. https://www.civcastusa.com/project/6a32f278e93337366ea93a46/summary lperez@pearlandtx.gov
PREBID
7/7/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT