Access the Full Project by Clicking here!
Bidjugde
JOB
Lake Ralph Hall Visitor Center Package 13 Utilities Paving
BID DATE
07/14/26 - 7:00
AGENCY
Upper Trinity Regional Water District
ESTIMATE
n/a
SCOPE
UTILITIES: 1-Stormwater 1-Approximately 800’ of 18” Storm Culvert with Inlet/Outlet Protection 2-Approximately 120’ of 24” Storm Culvert with Inlet/Outlet Protection 2-Water 1-Approximately 2400’ of 8” Water Line with misc. appurtenances and fittings 2-Approximately 220’ of 6” Water Line with misc. appurtenances and fittings 3-Approximately 2800’ of 2” Water Line with misc. appurtenances and fittings 4-Approximately 960’ of 3/4” Water Line with misc. appurtenances and fittings 5-Other misc. water pipe, fittings, and appurtenances 3-Sewer 1-Approximately 2200’ of 8” Sewer Line with manholes and fittings 2-Approximately 680’ of 6” Sewer Line and fittings 4-Electrical 1-Additional sleeves under paving for Future Package to use Paving 1-Street A 1-Approximately 6500 SY of 8” Paving and Flexbase 2-Approximately 350 SY of 6” Paving and Flexbase 2-Steet B 1-Approximately 2500 SY of 8” Paving and Flexbase 2-Approximately 350 SY of 5” Paving and Flexbase 3-Approximately 275 SY of 6” Paving and Flexbase 3-Trail 1-Granite Trail – Approximately 18000 sqft 2-Paving Trail – Approximately 27000 sqft 4-Restoration – Approximately ~40 acres 1-Contractor will be responsible for restoring the area when appropriate as work is complete. Hydromulching/Seeding per plans/specs, Watering, and Establishment. The building area will be restored by a Future Package 5-Coordination with CMAR for all materials testing. 6-Site rough grading (+/- 1”) has been completed by a previous contractor. Fine grading will be needed as required. 7-Laydown yard with flexbase and geogrid https://www.civcastusa.com/project/6a3ae83920634ff757f54c28/summary dwieck@walshgroup.com
PREBID
7/7/2026 6:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT