Access the Full Project by Clicking here!
Bidjugde
JOB
Orange Blossom Trail Phase 2
BID DATE
12/8/15 - 2:30
AGENCY
Redlands
ESTIMATE
n/a
SCOPE
The Orange Blossom Trail Phase 2 is a multi-use, non motorized trail. It is contained within existing, fully disturbed flood control right-of-way and spans from California Street, 1.2 miles east to Alabama Street. Within this span, the trail will cross four (4) streets. The project includes PCC pavement, AC pavement, decomposed granite, irrigation, and landscaping.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT