Lake Kiowa Water Main Replacements Phase 5
BID DATE
07/8/26 - 4:00
AGENCY
Greater Texoma Utility Authority
ESTIMATE
$6,030,033
SCOPE
Replacement of approximately 26,400 LF of asbestos cement (AC) water mains and services with high density polyethylene (HDPE) pipe by a combination of horizontal directional drilling and open trench methods; all mains are in the public r.o.w. and portions of the service connections are on private property. Installation of new fire hydrants, fire hydrant service lines and water appurtenances. Abandoning (in place) portions of the existing AC mains that are to be replaced as part of this Project. https://www.civcastusa.com/project/6a32b61cc58b2c8cb00aced0/summary mduval@cobbfendley.com