288b Utility Improvements
BID DATE
07/1/26 - 7:00
AGENCY
Angleton
ESTIMATE
$1,300,000
SCOPE
This project generally consists of installation of approximately 2,500 linear feet of 8-inch PVC water lines with the associated valves, fittings, and service connections, the encasement of 400 linear feet of new 8-inch water line crossings across SH 288B in 16-inch steel casing, and the removal and replacement of approximately 300 linear feet of existing 6” sanitary sewer crossings across SH 288B with new 6” PVC pipe and encasement in 12-inch steel casing. The project also includes the rehabilitation of 3 existing sanitary manholes, replacement of concrete curb ramps and sidewalks, and both concrete and concrete with asphalt overlay point repairs. https://www.civcastusa.com/project/6a2acc22f06b0dd3f0ce8ff8/summary john.peterson@hdrinc.com