Access the Full Project by Clicking here!
Bidjugde
JOB
Bonaventure Boulevard Bicycle Lanes Indian Trace SR 84
BID DATE
07/13/26 - 9:00
AGENCY
Weston
ESTIMATE
n/a
SCOPE
This project includes widening, milling, resurfacing, striping, and signing of Bonaventure Boulevard from Indian Trace north to SR 84 to provide 5’ to 7’ wide bike lane on both sides of Bonaventure Boulevard. The proposed bike lane will end 100 ft. south of the existing crosswalks on the approaching travel lanes to the roundabouts at Saddle Club Road and Blatt Boulevard and will begin after the existing crosswalks on the departing travel lanes of the roundabouts. The approximate length of the project is 9,200 linear feet. mperezgarviso@westonfl.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT