Access the Full Project by Clicking here!
Bidjugde
JOB
Kearny Water Reclamation Facility Improvements Phase 2
BID DATE
07/23/26 - 8:00
AGENCY
Kearny
ESTIMATE
n/a
SCOPE
The Project consists of compliance-related improvements to the Kearny WWTP, including demolition and replacement of the existing auger and associated appurtenances at the influent channel; installation of a flow metering system at the discharge to the river; and demolition and replacement of the existing splitter box with a new concrete structure, along with above ground piping for temporary inlet influent bypass system. The Project also includes noncompliance-related improvements, including construction of an above-ground stainless steel air piping for the blowers to replace the existing underground piping; installation of new pneumatic butterfly valves near the aeration basin; installation of a new a staircase and rotation of an existing one; demolition and replacement of the existing pump skid, hydropneumatics tank and compressor system, and related components with a new pump station package including centrifugal pumps, a hydropneumatics tank, tank compressor, and control components at the reuse pump station; removal and replacement of the existing valve assembly at the off-site irrigation station; demolition of existing walls and construction of new walls for blower control room expansion; and all related site, mechanical, and electrical work including all electrical components, panels, wiring, conduit, and instrumentation. kenhebert@ncseng.com
PREBID
7/1/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT