Access the Full Project by Clicking here!
Bidjugde
JOB
Myrtle Grove Elementary Outfall
BID DATE
07/9/26 - 2:00
AGENCY
Escambia County
ESTIMATE
n/a
SCOPE
The proposed improvements consist of the construction of approximately 1,400 linear feet of enclosed stormwater conveyance infrastructure extending along 62nd Avenue from the Myrtle Grove Elementary School (MGES) Pond to the intersection of Jackson Street and 62nd Street. The proposed drainage system will tie into an existing manhole located on the south side of the Jackson Street and 62nd Street intersection and ultimately discharge to the existing 62nd Street Pond. The construction will also include the installation of concrete driveways, minor utility adjustments for conflicts, minor sidewalk adjustments and the milling/resurfacing of 62nd Avenue from the MGES to the intersection with Jackson Street. The project is intended to improve hydraulic efficiency, increase system reliability during major storm events, and provide a controlled emergency overflow pathway for the MGES pond. https://procurement.opengov.com/portal/escambiacountyfl/projects/271902 tmbaker1@myescambia.com
PREBID
6/16/2026 4:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT