Street Pavement Preservation Citywide Phase 3
BID DATE
06/25/26 - 7:00
AGENCY
Beaumont
ESTIMATE
$4,200,000
SCOPE
The project consists of furnishing all labor, materials, equipment, tools, safety measures, environmental protection, disposal of surplus items, site restoration, and incidentals necessary to perform pavement preservation improvements on selected streets throughout the City. Work will generally include pavement milling, localized asphalt stabilized (ASB) base repairs, and placement of a thin surface asphalt concrete pavement (ACP) overlay, along with associated traffic control and surface restoration, all in accordance with the details and requirements on the plans and specifications. https://www.civcastusa.com/project/6a21a76c591953c8e41ec913/summary julie.hammond@beaumonttexas.gov
PREBID
6/17/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT