Access the Full Project by Clicking here!
Bidjugde
JOB
Smucker Park Detention Basin
BID DATE
06/26/26 - 6:30
AGENCY
Yuma County
ESTIMATE
$4,500,000
SCOPE
The project includes expansion of the existing Detention basin northwest of the existing Ray Smucker Park. The basin will be formed by connecting an earthen embankment, which will generally run parallel to, and on the east side of the East Main Canal and will tie into the existing slope on the north and south side of the project. The new detention basin includes an elevated access way bifurcating the basin from east to west. An underground pipe will hydraulically connect north end of the basin to the outlet pipe, which will be constructed near the south end of the basin. One existing large, highly specialized concrete box culvert entering the basin from the east will bring storm water to the basin from 28th Street while a temporary 12” storm drain bypass at Westridge Drive will bring stormwater to basin during construction of the new 42” storm drain system. A pathway will be constructed on top of the embankment with ramps leading down into the basin area. This pathway will connect to the future multi-use pathway system along the east bank of the East Main Canal. A connection ramp for this purpose is being constructed at the south end of the basin. A new asphalt access road and turn-around area for vehicles are included as part of this project. The alignment of the access road generally follows the existing asphalt/dirt roadway. Project also includes a new storm drain system at Avenue A & 28th Street and Avenue A & Westridge Drive, and includes new storm drain pipe, catch basins and asphalt replacement. Melinda.Barrett@yumacountyaz.gov alan.quintero@yumacountyaz.gov https://www.yumacountyaz.gov/Home/Components/RFP/RFP/541/663

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT