Access the Full Project by Clicking here!
Bidjugde
JOB
Thornton Water Project Source Water Pump Station
BID DATE
07/2/26 - 7:00
AGENCY
Thornton
ESTIMATE
n/a
SCOPE
Construction of a new Source Water Pump Station (SWPS), intake pipeline, intake structures, discharge pipeline, electrical service, and startup and commissioning of the SWPS; Construction of the Chemical Building, pressure reducing sleeve valve and flow meter (Segment A PRV and meter), and West Gravel Lakes (WGL) Pump Station chemical feed improvements; Lower Clear Creek (LCC) Canal pressure reducing sleeve valve and vault improvements; Signal Hill pressure instrument improvements; Startup and commissioning of the entire Thornton Water Project system, which includes pumping water for the SWPS to the Wes Brown Water Treatment Plant (WBWTP) through approximately 70 miles of pipeline. Additional components of the TWP system that will be incorporated into the startup and commissioning include the County Line pressure sensor, LCC Pressure Release Valve (PRV) and Meter, Segment A PRV and Meter, Greeley No. 2 Canal Return Flow Structure, Cache la Poudre River Return Flow Structure, Signal Hill pressure sensor and Chemical Feed Building. https://solicitations.thorntonco.gov/solicitations/11619?ReturnUrl=%2Fsolicitations patrick.hinterberger@thorntonCO.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT