Access the Full Project by Clicking here!
Bidjugde
JOB
RFP 2025 00 02 Green Ribbon I 635 Elam Road CSJ 2374 02 169
BID DATE
06/3/26 - 3:00
AGENCY
Balch Springs
ESTIMATE
n/a
SCOPE
The project scope consists of landscape improvements on TxDOT right-of-way at IH635 interchange at Elam Road in the City of Balch Springs. The project includes two-tiered interchange at IH635 and Elam Road within the TxDOT right-of-way. The work consists of protecting and transplanting existing trees and installation of new landscape material which consists of trees, shrubs, and seeding. The project also includes installation of permanent landscape irrigation. The existing irrigation controller and meter are to be utilized for the new permanent irrigation. The existing riprap is to be salvaged and reinstalled per plans, any additional riprap is to be hauled and coordinated with TxDOT and the City for location within 2.5 miles from the project site. In addition to the above, there will be other miscellaneous construction items as defined in the plans and specifications.. https://www.balchspringstx.gov/bids.aspx?bidID=39 cdyser@balchspringstx.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT