Access the Full Project by Clicking here!
Bidjugde
JOB
Petaluma Complete Streets
BID DATE
01/27/16 - 2:30
AGENCY
Petaluma
ESTIMATE
n/a
SCOPE
The WORK includes: in general, pavement rehabiliation, including, but not limited to, miscelaneous demolition, clearing and grubbing, removal and replacement of localized pavement failure, pavement grinding, conform grinding, crack sealing, placing of hot mix asphalt leveling course where necssary, placement of geosynthetic pavement interlayer, hot mix asphalt overlay, replacment of traffic loop detectors, reconfiguring of roadway striping for inclusion of shared lanes and/or Class II bike lines, pavement striping and markings, enhanced high visibility pedestrian crossings and installation of rectangular rapid flashing beacons. The work also includes replacement or enhancements of pedestrian ramps for ADA accessibility, concrete sidewalk replacement, curb and gutter replacement, and regrading where necessary to improvement drainge. The work includes temporary traffic control, notification of adjacent property owners, and other items of work shown on the plans and/or specified in the specifications. jcastro@ci.petaluma.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT