Access the Full Project by Clicking here!
Bidjugde
JOB
San Miguel Drive Pavement Rehabilitation
BID DATE
06/25/26 - 3:00
AGENCY
Newport Beach
ESTIMATE
$3,596,000
SCOPE
The work necessary for the completion of this contract consists of mobilization and demobilization; implementing best management practices (BMP); staking and survey monument restoration; traffic control plan preparation and implementation; public notifications; clearing and grubbing, utility company coordination and utility verification; removal of existing roadway improvements, subgrade preparation, cold milling of existing asphalt; construction of asphalt concrete (AC) pavement, asphalt rubberized hot mix (ARHM) pavement, full depth pavement section repairs, concrete patches, PCC curb ramps, PCC sidewalk, PCC curb and gutter, PCC curb, PCC cross gutters, PCC driveway, PCC pavement, Stamped PCC median pavement, truncated domes, and utility adjustments/relocations; storm drain improvements; installation of new traffic signal improvements and replacement of traffic signal loop detectors; traffic striping, pavement markings, pavement markers and curb markings; traffic signage improvements; regrading and repairs to impacted or damaged landscaping and irrigation system improvements; as-built plan preparation, and all other work required by the Contract Documents. https://vendors.planetbids.com/portal/22078/bo/bo-detail/142801 djordan@newportbeachca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT