Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Wonderland Acres DWID
BID DATE
06/25/26 - 8:00
AGENCY
ADOA
ESTIMATE
$3,200,000
SCOPE
The CMAR will coordinate with the engineer to execute the replacement of approximately 12,816 linear feet of existing watermains with 4-inch PVC piping. Replacement of 169 service laterals up to the water meters, directly adjacent to their existing location. It is assumed existing water meters and shut off valves will be left in use. A portion of watermain will be relocated out of existing customer yards to be within the Right-ofWay. Key infrastructure upgrades involve the installation of three altitude valves equipped with timers to enable controlled tank filling through system pressure and the rerouting of pipelines. dustin.deason@azdoa.gov https://app.az.gov/page.aspx/en/bpm/process_manage_extranet/13693
PREBID
6/16/2026 4:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT