Access the Full Project by Clicking here!
Bidjugde
JOB
Runway Safety Area Grading Drainage
BID DATE
07/7/26 - 8:00
AGENCY
Carson City Airport Authority
ESTIMATE
n/a
SCOPE
Carson Airport Authority Airport Pavement Preservation Project will remove the stopway and extend the runway 1000 feet to the north and 500 feet to the south. Finally, the existing portion of the runway will be repaved. The runway 33 glide slope will be relocated. The new runway 33 localizer has already been installed by FAA Technical Operations and only needs to be switched on. Runway 15 is currently served only by a localizer, which will remain in operation as it will be beyond the future Runway Safety Area. bmartinezmoles@woodrodgers.com cjenkins@flycarsoncity.com
PREBID
6/19/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT