Cast Iron Sewer Replacement FY 20242025 Package I
BID DATE
06/18/26 - 4:00
AGENCY
San Jose
ESTIMATE
n/a
SCOPE
The Project generally involves the removal of 146 linear feet of existing corroded unlined cast iron pipe (CIP) and subsequent replacement with epoxy lined ductile iron pipe (DIP). This project also includes 3,020 linear feet of cured-in-place liner (CIPP) in existing 6-inch and 8-inch sanitary sewer pipe, reconnection of sanitary sewer service laterals, the construction of one sanitary sewer manhole and one sanitary sewer drop manhole connection. https://biddingo.com/sanjose/bid/1/41205949/41429628/verification