Capital Pavement Program Preservation Overlay
BID DATE
06/23/26 - 10:00
AGENCY
Ukiah
ESTIMATE
n/a
SCOPE
Grinding and paving in multiple locations. All work to be performed is within the City of Ukiah. Talmage Road from State Street east to the Great Redwood Trail: The work involves complete surface grinding down 3” and placing 3” AC overlay over existing asphalt concrete. ADA ramps will be installed at Talmage Road and Waugh Lane. All roadway grinding and paving on Talmage Road must be completed at night to avoid shutting down businesses during the day. Waugh Lane from Talmage Road north approximately 740’: The work involves complete surface grinding down 3” and placing 3” AC overlay over existing asphalt concrete. Mendocino Place from Mendocino Drive to the end of the cul-de-sac: The work involves complete surface grinding down 3” and placing 3” AC overlay over existing asphalt concrete. Installation of new 6” water main and related services. ADA ramps will be installed at Mendocino Place and Mendocino Drive along with modifications to the existing storm drain and installation of new storm drain infrastructure. https://www.bidnetdirect.com/california/solicitations/open-bids/Capital-Pavement-Program-Preservation-and-Overlay/0000424314?purchasingGroupId=88020151&origin=2 mfisette@cityofukiah.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT