Spring Street Maintenance 1st to 10th
BID DATE
02/11/16 - 3:00
AGENCY
Paso Robles
ESTIMATE
$2,567,200
SCOPE
Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Spring Street Maintenance – 1st to 10th, DPW Project No. 12-12F-2, according to drawings and specifications prepared by the City of El Paso de Robles and according to the Contract Documents. The work shall include but is not limited to, installation of sewer lines, storm drain pipelines, water pipelines, curb, gutter, sidewalk remove and replace, base dig-out repairs, cold planing of existing paving, installing rubberized hot mix asphalt, install new video detection for traffic signals, pavement striping and markings all as shown on the plans and/or as specified herein.