Basin 15 Drainage Improvements Phase 1 NW 108th Avenue Culvert Replacement
BID DATE
06/25/26 - 7:00
AGENCY
Sunrise
ESTIMATE
n/a
SCOPE
The project work will include sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, dewatering, demolition and replacement of existing canal culvert pipe and street drainage pipe and structures, demolition and restoration of pavement, curb and sidewalk, shaping and excavation and grading of the existing canals banks, construction of concrete end walls, construction of filter point grout mat, replacement of existing 10” PVC gravity sewer main with 10” ductile iron pipe, pavement milling and resurfacing, pavement markings, sodding, guardrail and other miscellaneous and incidental items for a complete project.as shown in the drawings. https://www.demandstar.com/app/limited/bids/536004/details