Access the Full Project by Clicking here!
Bidjugde
JOB
Applewood Haley Nelson Trail Paving
BID DATE
06/25/26 - 4:00
AGENCY
Burnet
ESTIMATE
$500,000
SCOPE
Base Bid: Reconstruction of approximately 6,500 lf of 7’ wide concrete walking trail, and 470 lf long and 29’ wide of roadway called Applewood Dr from N Applewood to end of Cottonwood Dr. Improvements involve work with base and concrete pavement, including but not limited minor drainage work and grading. Other miscellaneous items include implementing traffic control as approved by the city, tie-in to existing roads, and a phased approach to construction. Applewood Dr. must be substantially completed by the time school starts in early August. The contractor is required to provide a 1-year 10% maintenance bond along with P&P bonds. Added Bid Alt1: Haley Nelson Trail- 7’ wide x 5.5” thick Added Bid Alt2: Haley Nelson Trail- 8’ wide x 4” thick Added Bid Alt3: Haley Nelson Trail- 8’ wide x 5.5” thick https://www.civcastusa.com/project/6a10d8b74abf9af4ed6d6a34/summary ebelaj@cityofburnet.com
PREBID
6/11/2026 4:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT