Access the Full Project by Clicking here!
Bidjugde
JOB
31st Street Fontenero Roundabout
BID DATE
06/23/26 - 9:00
AGENCY
Colorado Springs
ESTIMATE
$6,000,000
SCOPE
The project will demo the existing culverts under the intersection and replace the culverts with a new cast-in-place concrete box culvert with inlet and outlet protection. The 4-way stop sign-controlled intersection will be replaced with a Roundabout intersection with only Yield signs. The scope of the proposed roundabout construction includes improvements to the existing sidewalks and curb ramps associated with the intersection of 31st and Fontanero Street. These proposed roadway improvements involve pavement replacement, pavement milling and resurfacing, sidewalk and curb ramp replacement, and curb and gutter replacement. These improvements will not significantly alter the existing drainage patterns. All of the proposed improvements and maintenance of the improvements are public. https://www.bidnetdirect.com/colorado/solicitations/open-bids/31st-Street-Fontenero-Roundabout/0000425661?purchasingGroupId=8409951&origin=2 michael.zeller@coloradosprings.gov
PREBID
6/2/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT