Access the Full Project by Clicking here!
Bidjugde
JOB
Ames Baker Circle Road Reconstruction
BID DATE
06/10/26 - 7:00
AGENCY
Ames
ESTIMATE
n/a
SCOPE
1-Mobilization To Project Site; 2-Provide Traffic Control Plan, Sealed by P.E. in Texas; 3-Implement Traffic Control Plan; 4-Prepare Right of Way; 5-Provide and Implement BMP within SWPPP; 6-Remove and Dispose of Existing Concrete Drive, Treated Base, Untreated Base, and Subgrade; 7-Remove and Dispose of Existing Rock Drive, Treated Base, Untreated Base, and Subgrade; 8-Remove and Dispose of Existing ACP Main Road, Treated Base, Untreated Base, and Subgrade; 9-Provide, Install, Mix, and Compact Lime Treatment of Subgrade (8-inch Depth/Road Mixed), Main Road; 10-Provide and Install Flexible Base Foundation Course (8-inch Depth/Ty-B), Main Road; 11-Provide and Install Ty-D HMAC Level-Up Surface for Bond Breaker (2-inch Usual), PG Binder 64-22, for Main Road. Including Trackless Tack. 12-Provide and Construct Reinforced Hydraulic Concrete Cement Pavement with Laydown Curb (8-inch Depth, Class-P 4,000-psi), Main Road; 13-Provide and Construct Reinforced Hydraulic Concrete Cement Driveway with Curb Transition (6-inch Depth, Class-P 3,000-psi), Including 6-inch Flexible Base; 14-Provide and Install Backfill Pavement Edges with Ty-B Material; 15-Provide and Install Hydromulch for less than 1-Acre; 16-Remove, Dispose, and Replace Reinforced Concrete Catch Basin, including excavation and backfill; 17-Provide and Install 18-Inch Thermoplastic Pipe, Including Pavement Removal, Excavation, Backfill, and Surface Restoration; 18-Clean Drainage Culverts, Excavate, and Reshape roadside ditches; 19-Provide and Install long-Side Water and Sewer service lines (Supplemental Items) 20-Protect Adjacent Roadway and Other Structures. If Removal Of Pavement Is Required Or Damage, The Contractor Shall Remove, Replace, Or Repair At No Additional Cost To Owner; 21-Dispose Of All Waste Material At No Additional Cost To Owner; 22-Notify 811 For Utility Locates and Verify All Utility Conflicts. Contractor shall be responsible for protecting all utilities, pipelines, roads and structures during operations. Any damage caused by the Contractor shall be the sole responsibility of the Contractor to repair or replace; 23-Groundwater Management, Excavation, Backfilling, and Final Stabilization Not Specifically Mentioned In The Plans Or Identified Within a Bid Item shall not be paid for directly and shall be considered incidental. https://www.civcastusa.com/project/6a04e3b1dcbfda97cb4c3bef/summary hcrochet@lja.com
PREBID
6/1/2026 3:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT