Access the Full Project by Clicking here!
Bidjugde
JOB
Port Orchard Marina Breakwater Replacement
BID DATE
07/1/26 - 7:00
AGENCY
Port Orchard
ESTIMATE
$20,000,000
SCOPE
This project will include new north and east breakwaters, approach floats, a new gangway, and demolition of the existing structures and utilities. The breakwater, approach floats, and gangways are performance specified for the fabricator's final design. The anchoring system for the floats in fully designed as well as the float utilities. Utility infrastructure includes dock water systems, dock fire systems, dock sewer systems, sewer forcemain, and electrical. The upland utility work includes temporary erosion and sediment control (TESC); existing utility protection, and site restoration, including paving and landscaping. The project mitigation requirements include the demolition of two timber piers located within one mile of the site. This project is anticipated to be completed in phases over two years. https://mrscrosters.bonfirehub.com/opportunities/235867 ellena@portofbremerton.org
PREBID
6/1/2026 6:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT